Kashmir

Power Shutdown

SRINAGAR — According to the Chief Engineer, Distribution, KPDCL, in order to carry out construction of 33KV Pulwama 2nd Circuit under Phase II from 160 MVA GIS Lassipora, the shutdown of 132/ 33 KV GIS Lassipora (160 MVA) shall be observed due to which 33/11KV Receiving Stations at Pulwama, Pinglena, MM Flour Mill, Covid Hospital […]

Kashmir

KPDCL set to install meters on 40,000 DTs, 1400 Feeders for reliable power supply

SRINAGAR — In order to protect distribution transformers (DTs) from damage and curb power losses, Kashmir Power Distribution Corporation Limited (KPDCL) is installing 40,000 DT meters & 1200 feeder meters under the premier loss reduction scheme of RDSS. This shall be besides 6.85 lakh consumer smart meters which shall be installed in unmetered flat-rate areas […]

Kashmir

KPDCL intensifies drive against non-paying consumers, thousands of connections snapped

SRINAGAR — Kashmir Power Distribution Corporation Limited (KPDCL) has intensified its drive against non-payment of electricity bills and remotely disconnected thousands of smart-metered consumers. Similarly, in flat-rated areas, those consumers who haven’t paid their pending dues for months together are being physically disconnected, till they clear their bills with KPDCL. In a press statement issued […]